Skip to content. | Skip to navigation

Coorperations
Max-Planck-Institut für Gravitationsphysik, Leibniz Universität Hannover, Max-Planck-Institut für Quantenoptik,
University of Glasgow, Cardiff University, University of Birmingham, Universitat de les Illes Balears
Personal tools

September 1996

The wooden hut in front of the eastern end-house. The central station, now fully encased. A look from the top of the central station to the northern end-house.
The wooden hut in front of the
eastern end-house.
 The central station, now fully
encased.
   
A look from the top of the central
station to the northern end-house.
     
The delivery of new tubes in front of the eastern end-house. The tubes are stored within the wooden hut.
 A tube is placed in front of the sluice...
The delivery of new tubes in front
of the eastern end-house.
 The tubes are stored within the
wooden hut.
 A tube is placed in front of
the sluice ...
     
... and pushed into the interior of the eastern end-house. Alexander removes the protective cover off the tube.
 The tube hovers above the welding machine.
 The welder at work.
... and pushed into the interior of
the eastern end-house. Alexander
removes the protective cover off
the tube.
 The tube hovers above the
welding machine.


 The welder at work.



     
The tube is pushed into the trench.
 Benno shows how the tube is suspended.
 Alexander in the trench pushing the tube.
The tube is pushed into the trench.

 Benno shows how the tube is
suspended.
 Alexander in the trench pushing the tube.