June 1996

Now, on the 24th of June, the eastern end-house is finished, the welding machine is in place, and the rail where the tube will be hung from is installed and adjusted. We have built a "wooden hut" with a shelf inside which takes up to 6 pieces of the 4.5 m tube sections for short term storing capacity. The trench is ready and covered with corrugated sheet metal. The welding of the tube will (hopefully) begin within a week or two.

The ramming of the second trench is nearly completed. There are only about 100 m left. We are currently checking the vacuum properties of a 75 cm test section taken out of the manufacturing process. The first results look promising.

View into the central station (from the entrance). You can see the beginning of the south-north trench (left side of the picture), and the west-east trench (right side).
 The eastern end house with the wooden hut. Michaela is just taking spectra of the seismic motion inside the end house. Inside the eastern end house. The red part (to keep people off from here) is the separate foundation where the tank will be placed upon. From here the tube will lead 600 m to the central station.
View into the central station (from
the entrance). You can see the
beginning of the south-north trench
(left side of the picture), and the
west-east trench (right side).

 The eastern end house with the
wooden hut. Michaela is just taking
spectra of the seismic motion inside
the end house.


 Inside the eastern end house. The
red part (to keep people off from
here) is the separate foundation
where the tank will be placed
upon. From here the tube will lead
600 m to the central station.
     
Inside the eastern end house. Sir Harald on his horse ('wild fiesta blue'), ready to fight the black knight... Installing the rail, where the tube will be hung at. Each rail segment has a length of 12 m.
Inside the eastern end house. You
can see the welding machine (red)
with a short test segment of tube
in front of the port in the wall leading
to the trench (with the black seal to
keep the building dust tight when
welding the tube) and another tube
section to see whether everything
fits together. During the welding
process the building will be slightly
pressurized to prevent dust entering
the building. An air lock allows to
enter the building.
 Sir Harald on his horse ('wild fiesta
blue'), ready to fight the black knight...











 Installing the rail, where the tube
will be hung at. Each rail segment
has a length of 12 m.















On a hot summer day (temperatures are above 30°C), the rail for the west-east trench is going to be installed.

Hans in the trench, installing the rail, which is hung each 3 m from the reinforcement beams between the panels.

Hans and Benno working in the trench.
On a hot summer day (temperatures
are above 30°C), the rail for the west-
east trench is going to be installed.
From the left to the right you see:
Mathias, Michael, Hans, Andreas, and
Dirk. The electrical drill is mounted on
a trailer behind an old tractor. A
generator is placed on the pickup
seen on the left hand side.



Hans in the trench, installing the rail,
which is hung each 3 m from the
reinforcement beams between the
panels. The wheels sitting atop the
reinforcement beams allow thermal
expansion of the rail, which is bolted
together at the joints and therefore
acts as one long rail. The thermal
expansion between winter and
summer of the whole rail is expected
to be roughly 60 cm.

Hans and Benno working in
the trench.














READY! You can see a part of the roof that will cover the trench.

from left to right: Benno, Michael, Hans, Andreas (back), Mathias, Mia, Jeannie

from left to right: Mathias, Michaela, Michael, Andreas, Hans, Benno
READY! You can see a part of the roof
that will cover the trench. Attached to
the rail you can see the trolley for
pushing the tube out of the end house.
The black wheel connected to the trolley
takes the rope where the tube will rest
in. That way the whole tube can be
rotated around it's axis. In the trench
on the right hand side you see the
power supply cable running to
the central station.

And now it's ...

(from left to right: Benno, Michael,
Hans, Andreas (back), Mathias, Mia, Jeannie)








... teatime.

(from left to right: Mathias, Michaela,
Michael, Andreas, Hans, Benno)