Up to now the ramming for the eastward trench has been completed and the first 100 m for the northward trench have been done.

17th January 1996

The reinforcement beams stabilizing the trench, are welded to the I-beams running along the panels to prevent the trench from collapsing. The welders use a small cart running on the I-beams with a portable generator put atop.
The reinforcement beams stabilizing
the trench, are welded to the I-beams
running along the panels to prevent
the trench from collapsing.
 The welders use a small cart running
on the I-beams with a portable
generator put atop.


18th January 1996

The steel construction for the central station has been set up. To get an idea of the scales: The hole in the northern wall, where the tube will finally pass through, has got a diameter of 1m. The building is 8 m x 13 m. Meanwhile the insulation (a sandwich construction of aluminium sheets with insulating foam in between) is fixed to the eastern end-house.
The steel construction for the central
station has been set up. To get an idea
of the scales: The hole in the northern
wall, where the tube will finally pass
through, has got a diameter of 1m. The
building is 8 m x 13 m.
 Meanwhile the insulation (a sandwich
construction of aluminium sheets with
insulating foam in between) is fixed to
the eastern end-house.



19th January 1996

The builders have to use the most sophisticated and modern equipment in their struggle to get the building closed before they are frozen to the ground. At this time of the day it is -8°C and a freezing eastern wind. Imagine, this is supposed once to become a cleanroom!!
The builders have to use the most
sophisticated and modern equipment in
their struggle to get the building closed
before they are frozen to the ground.
At this time of the day it is -8°C and a
freezing eastern wind.
 Imagine, this is supposed once to
become a cleanroom!!





20th January 1996

20th January 1996

21st January 1996

21st January 1996  21st January 1996

29th January 1996

29th January 1996  29th January 1996  29th January 1996


Except for the first week of January work has completely been stopped. The wheather is extremely cold right now, the ground is frozen to a depth of about one and half a meter. This morning's (9.2.1996) temperature has been -17°C. Within the next week there is no change to be expected.