History of GEO600

GEO Diary

Since September 1995 we build the British-German gravitational wave detector. These pages show how GEO600 forges ahead. Here you find the very latest pictures from the detector site and information from our labs.

Predicted by Einstein 100 years ago, gravitational waves have now been directly detected for the first time. The signal of two merging black holes has been found by the LIGO detectors in Hanford and Livingston, USA.

February 2016 – direct detection of gravitational waves

Predicted by Einstein 100 years ago, gravitational waves have now been directly detected for the first time. The signal of two merging black holes has been found by the LIGO detectors in Hanford and Livingston, USA. [more]
GEO600 taking data simultaneously with advanced LIGO

September 2015

GEO600 taking data simultaneously with advanced LIGO [more]
Spatially resolved heating of the beam-splitter

2015

Spatially resolved heating of the beam-splitter [more]
Towards a darker dark port – installation of a new thermal compensation system

2014

Towards a darker dark port – installation of a new thermal compensation system [more]
Squeezing was used over one complete year in GEO600

2013

Squeezing was used over one complete year in GEO600 [more]
Upgrading the modecleaner optics for higher laser power

2012

Upgrading the modecleaner optics for higher laser power [more]
GEO600-Virgo 3-month joint run

2011

GEO600-Virgo 3-month joint run [more]
<span>Summer 2010: Implementation of squeezed light in GEO600</span>

2010

Summer 2010: Implementation of squeezed light in GEO600 [more]
<span>July 2009: Start of S6/VSR2</span>

2009

July 2009: Start of S6/VSR2 [more]
Astrowatch

2008

Astrowatch [more]
Damages at the control system, short circuits, and preparations for a maintenance period.

2007

Damages at the control system, short circuits, and preparations for a maintenance period. [more]
May 2006: GEO600 joins the S5 science run

2006

May 2006: GEO600 joins the S5 science run [more]
Science run 4: February and March, 2005.

2005

Science run 4: February and March, 2005. [more]
Most of the time in 2004 has been spent to upgrade the detector.

2004

Most of the time in 2004 has been spent to upgrade the detector. [more]
Science run 1 and science run 3.

2003

Science run 1 and science run 3. [more]
Improvement of the GEO sensitivity and science run 1.

2002

Improvement of the GEO sensitivity and science run 1. [more]
Installation of optical components and their suspensions, and the laser.

2001

Installation of optical components and their suspensions, and the laser. [more]
Installation of suspensions, testing of new control system...

2000

Installation of suspensions, testing of new control system... [more]
Installation of modecleaner tank TCMa, test run of the main suspension...

1999

Installation of modecleaner tank TCMa, test run of the main suspension... [more]
Final design review and installation of the modecleaner double pendulums, GEO600 has been registered as one of the Projects of the World Exposition EXPO 2000 in Hannover...

1998

Final design review and installation of the modecleaner double pendulums, GEO600 has been registered as one of the Projects of the World Exposition EXPO 2000 in Hannover... [more]
Welding of the second tube, installation of the cleanroom facilities for the central station, insertion of the liners, wraping the tube,...

1997

Welding of the second tube, installation of the cleanroom facilities for the central station, insertion of the liners, wraping the tube,... [more]
Erection of buildings, ramming of the trench, installation of the rail in the trench, ...

1996

Erection of buildings, ramming of the trench, installation of the rail in the trench, ... [more]
GEO600 Groundbreaking Party, building of the central house and the eastern end house, ...

1995

GEO600 Groundbreaking Party, building of the central house and the eastern end house, ... [more]
 